Before Rooftop Solar Goes On: Who Handles Future Roof Access and Repairs?

By Jason Daggy — Founder, AZ Coatings  •  4 min read  •  Commercial Applications

Four workers review plans beside solar panels on a flat roof

Before solar panels go on your roof, plan for future repairs. Who will reach the roof? Who will move panels if needed? Who will pay for that work? Put the answers in writing while the plans can still change.

Bring the building owner, roofer and solar installer into the same talk. Include the company that makes the roof system. Each team needs to know its own job. Do not assume one contract covers all the work.

Can Crews Reach the Roof?

Ask the design team to show clear routes to drains and roof openings. These openings may hold pipes or vents. How will crews reach the roof under and between the panels?

GAF's guide to roof design for solar says panel layouts and rack heights should allow access to the roof membrane. The membrane is the layer that keeps water out. GAF calls for access around drains and roof openings. Its guide also covers access for roof care and fire safety.

This is GAF's guidance. Your roof system and local rules may have other needs. Ask the team to check those needs for your building.

Have the team mark the routes and clear space on the plans. Who will check them? Can crews use them to inspect and fix the roof? Ask the people who handle your roof care plan to review them too.

Who Moves the Panels for a Repair?

A roof repair may need panels moved out of the way. Ask the roofer and solar installer to agree how this will work. Set the plan before the panels go on.

Get written answers to these questions:

  • Who do you call first if a leak starts near the panels?
  • Who decides if panels need to move?
  • Who brings the right crews together?
  • Who takes the panels off, stores them and puts them back?
  • Who sets the dates and approves the costs?
  • Who checks both systems before crews put them back in use?

Ask about urgent leaks as well as planned repairs. A roof warranty may cover some roof work. That does not mean it pays to move solar panels.

What Do Your Warranties Cover?

A warranty sets out what a company agrees to cover and the terms that apply. Get the roof and solar warranties. Ask each company to explain its terms for your roof and your planned panels. Get those answers in writing.

Ask these questions before work starts:

  • Does the plan need review or written approval?
  • Who is allowed to change the roof?
  • What checks and records are needed after the work?
  • Who pays if the work damages the roof?
  • Does the warranty cover finding a leak under panels?
  • Does it cover taking panels off and putting them back?

Write down what is covered and what is not. Terms can differ by roof maker, product and contract. Adding solar does not always end roof coverage. Do not assume coverage stays the same, either.

Our guide to coating a roof before leaks start covers a separate choice. It does not tell you if your roof can support solar panels.

Who Checks the Roof and Solar Design?

Ask the qualified design team to check the roof's condition. They also need to review the added weight and how panels will attach. Ask who will check the rules for the building, roof, power system and fire safety.

If the roof needs work first, ask what work and why. The right choice may be repair, restoration or a new roof. Restoration means work to renew the roof you have. Base the choice on the checks for your building.

A plan to coat the roof does not prove it is fit for solar. Our guide to roof restoration explains the roof work to discuss with your roofer.

How Will Crews Plan Safe Work?

OSHA lists shock and fall risks in solar work. OSHA is the federal workplace safety agency. Ask qualified electrical and roofing teams to make a plan for this site. They need to agree on the plan before roof care starts near the panels.

Who will check the risks? Who will set any needed controls for power and safe access? Who will keep people out of work areas? Who will confirm when work can start?

Ask how each employer will share its safety needs with the other crews. A simple instruction to turn the panels off does not prove the area is safe. Leave the safety checks and steps to the qualified teams.

Keep the Plan in One Place

Keep the agreed drawings, contact names, approvals and warranties. Add inspection records and photos. Include who to call about a leak and how crews will get under the panels. Choose one person to keep this file up to date.

The goal is to know who to call and how to get a repair done. Set the plan before the panels go on.

Common questions

Who moves solar panels when the roof needs repair?

Agree on this with the roofer and solar installer before panels go on. Write down who decides if panels must move. Name who does the work, who sets the dates and who pays.

Does adding solar end my roof warranty?

Not always. Ask the roof warranty provider to review your plan. Get the terms for your roof and panels in writing. Do not assume coverage ends or stays the same.

What should the team check before panels go on?

Ask qualified teams to check the roof, added weight and panel design. They should review the rules for your building and access for later repairs. Agree who handles each job.

What records should the building owner keep?

Keep plans, approvals, warranties, contact names, inspection records and photos. Add the steps for reporting a leak and arranging roof access. Name who keeps the file up to date.

About the Author

Jason Daggy

Founder of AZ Coatings and SPFA-certified polyurea specialist, with field experience restoring commercial flat roofs. Read full bio →

Plan the roof work

Talk about roof repairs before solar goes on

Talk to AZ Coatings about the roof work. Include your solar installer and qualified design team in the plan.